Raimondi Middle East installs 12 flat-top cranes for major retail and entertainment development in UAE; marks T577 regional debut
News: 24 November 2026
News: 24 November 2026
Raimondi Middle East has deployed 12 out of the 14 flat-top tower cranes allocated to support the construction of Madar Mall in the immediate term.
A retail, leisure and entertainment destination within Aljada, Madar Mall is part of the Sharjah megaproject being developed by Arada in the UAE. The site planning calls for the first tranche of 14, with several more machines planned for the site at a later date.
The cranes currently operating onsite include six Raimondi T577s and six MRT294s. The additional two flat-tops, a MRT294 and a MRT159, are scheduled for installation shortly.

The Madar project site is the first in the MENA region to see the T577 deployed. Raimondi’s latest addition to its tower crane portfolio, the 24t model delivers high lifting performance, with a tip load of 3.41 tonnes in UltraLift mode at an 80-metre maximum radius and a 110kW hoisting gear.
Suited to the site requirement of a 24t capacity, particularly for the handling and positioning of precast concrete panels and structural steel elements, the T577 can lift at a maximum speed of 110m/min and has a drum capacity of 1030m.
“The deployment of six T577s at Madar Mall marks an important milestone for Raimondi Middle East, reflecting our commitment to support the delivery of increasingly ambitious construction projects across the Emirates and the wider GCC,” stated Wael Hasan, General Manager, Raimondi Middle East.

The 12 cranes are operating at freestanding heights ranging from 41m to 60m, with jib lengths of up to 60 meters. With maximum lifting capacities between 16t to 24t, the models accommodate the project’s specific lifting requirements, tight schedule and site conditions.
“Delivering a deployment of this scale has required close coordination between all parties involved, with installation schedules, site readiness, logistics and resource allocation carefully managed to ensure continuity throughout the site progress,” Hasan affirmed. He further highlighted that Raimondi strives to provide the region’s contractors with best-in-class machines, singling out the T577 for its combination of significant lifting capacity, versatile jib configurations and operational flexibility.

Raimondi Middle East’s involvement in this large-scale project continues to grow, with the site currently hosting a significant 41 Raimondi cranes across the Aljada megaproject.
The deployments reflect the confidence placed in the company’s equipment and regional capabilities. Raimondi remains focused on providing our customers with reliable lifting solutions, and responsive service throughout every stage of construction. Earlier this year, the UAE-based division also celebrated a major operational milestone, with 100 Raimondi cranes simultaneously operating across the United Arab Emirates.
Raimondi Middle East continues to strengthen its position as a lifting solutions provider for large-scale construction developments, combining a comprehensive tower crane portfolio with local technical expertise and dedicated operational support.
Related: Raimondi Middle East marks leading market position with 100 cranes operating in UAE