Cranes Today: Raimondi flat tops in Cyprus
In The Press: 16 December 2020
In The Press: 16 December 2020
Three Raimondi MRT111 flat top tower cranes have been deployed for the construction of the Limassol Del Mar beachfront complex in Limassol, Cyprus.
Raimondi’s Cypriot agent, ConAgro sold the MRT111 cranes, with jib length ranging between 42m and 50m, directly to AMIC Contractors. The assembly and erection of each crane took place over a period of four days.
“Due to the congested project location, as well as the necessity to avoid any interferences between cranes, the Raimondi technical department carefully evaluated the erections of the cranes as part of the site planning procedures. The Raimondi team also studied the climbing sequence of all the cranes,” said Carmine Puca, application engineering manager, Raimondi Cranes.